How Much Does Roofing Cost in Brisbane?
A single roof leak repair in Brisbane typically costs $290 to $920, a full ridge capping rebed and repoint $920 to $4,025, a tile roof restoration $4,600 to $12,650, and a Colorbond re-roof $92 to $205 per m² (about $25,200 for a 180 m² home). These are published Brisbane figures, GST included, not our quotes.
Updated November 2026
Brisbane roofing price ranges
Other published Brisbane figures: roof inspection and report $200 to $500, downpipe replacement $35 to $90 per metre, and licensed asbestos-cement roof removal $50 to $130 per m² before the new roof (whatsthedamage.com.au).
The standard we ask of every roofer we refer you to
The roofer does the work, not us. Ask for each of these in your written quote and contract.
- A roofer with a QBCC licence for the work and public liability insurance (certificate on request)
- A written quote that lists what will be done, the materials and the price
- A written contract and QBCC Home Warranty cover for residential jobs over $3,300, as Queensland law requires
- Photos of the problem before work starts, and of the finished work
- Roof sheets fixed and tied down to suit Brisbane's storm winds
- Site left clean: old tiles, sheets and screws taken away, gutters cleared of debris
- A walk-through of the finished job before final payment
Before and after photos, and a written scope
You get photos of what was wrong and what was done, and a written scope before anything starts, so you know exactly what you are paying for.
Licensed, insured roofer, public liability certificate on request
What changes the price?
Roof size and pitch
Square metres of roof and how steep it is. Steep and two-storey roofs need more safety gear and time.
What is actually wrong
One leak at a flashing is a short job. Leaks in several places, or failing bedding under the ridges, is a bigger one.
Access
Steep or sloping blocks, high-set Queenslanders, tight side access and scaffold all add cost.
Bayside exposure
Homes close to Moreton Bay may need higher-rated COLORBOND Ultra or stainless fixings under BlueScope's coastal guidance, which cost more.
Tile to metal
Re-roofing a tile roof including strip-off is published at $100 to $220 per m² in Brisbane, against $80 to $180 for Colorbond over Colorbond, and battens usually change to suit metal.
Bundling
Doing gutters with a re-roof, or ridge capping with a restoration, is cheaper than separate jobs.
Queensland rules that protect you
- Building work valued over $3,300 needs a QBCC licence, and advertising for that work must show the licence number (QBCC).
- For residential work over $3,300 the contractor must take out QBCC Home Warranty cover on your behalf, with the premium included in the deposit (QBCC).
- Under $20,000 the deposit is capped at 10%, and jobs of $20,000 or more need a Level 2 regulated contract (QBCC).
- Gutters, downpipes and roof drainage are regulated plumbing work in Queensland, so ask who holds the plumbing licence.
- You can check any roofer's licence on the QBCC website.
A roof job done properly, by a licensed roofer
A cheap roof job that only patches the stain usually means paying twice. That's why every job we pass on goes to a licensed, insured Brisbane roofer who agrees to this standard before they get the work.
QBCC licensed
In Queensland, building work valued over $3,300 needs a QBCC licence, and the contractor must take out Home Warranty cover on residential jobs over that amount. Jobs only go to roofers who hold the right licence and insurance.
The cause, not just the drip
Most leaks show up metres away from where the water gets in. The roofer finds the entry point (flashing, ridge, cracked tile, rusted screw) and fixes that, not just the stain.
Built for storm season
Brisbane's spring and summer storms bring hail and strong wind gusts. New roofs should be fixed and tied down properly, not just laid over the old frame.
Safe on the roof
Roof work is high-risk work under Queensland's work health and safety rules. Roofers use edge protection or harnesses, not a ladder and good luck.
A written price first
You get the scope and price in writing before work starts, and any change should be agreed in writing.
Photos of everything
Before and after photos of the problem and the repair, so you can see what you paid for without climbing up.
Left clean
Old tiles, sheets, screws and offcuts taken away, and gutters cleared of anything that came off the roof.